Projects


97 Burman Road

97 Burman Road

The 97 Burman Road project is a 400m2 warehouse extension, consisting of demolitions and alterations to the existing building, metal roof sheeting and side cladding tie ins, a new surface bed, bricks walls, roller doors, electrical works and the supply an


ACSA Airport Works / Stormwater

ACSA Airport Works / Stormwater

Dams and Reservoirs


Addo Cold Storage

Addo Cold Storage

Addo Cold Storage


Addo Kooperasie - Water Harvesting Reservoir

Addo Kooperasie - Water Harvesting Reservoir

Dams and Reservoirs


Amahleke

Amahleke

Dams and Reservoirs


APLI - Coega

APLI - Coega

Bulk Earthworks, services and surfacing for a new Citrus packhouse, Cold Storage and distribution facility in the Coega IDZ.


Belmont Valley Golf Estate

Belmont Valley Golf Estate

Construction of Irrigation Dam and Bridge to Belmont Valley Golf Estate. Constructed 2016, Engineers MBB Consulting Engineers Grahamstown.


Bidfood Distribution Centre

Bidfood Distribution Centre

The new +- 8 100m² Bidcorp project consists of a warehouse, cold-storage, a receiving airlock dispatch center facility and has 3 double storey office units on the external facades of the building. External works are made up of hardstands, paving, dock lev


Boardwalk Casino

Boardwalk Casino

125 000m³ of Hard Rock blasting 10m Deep for the Boardwalk Casino Extension and all bulk services, Built 2012, Engineers Structural Solutions, Project Managers SIP.


Cape Town Cycle Path

Cape Town Cycle Path

5.8km of Cycle path for the city of Cape Town.


Clarendon Primary

Clarendon Primary

Full Sized Astro Turf Pitch and Mini pitch for Clarendon Primary School, Current Build, Engineered in-house by Randcivils.


Clicks Office / Warehouse

Clicks Office / Warehouse

Dams and Reservoirs


Collegiate Girls’ High School

Collegiate Girls’ High School

International Size full specification Astro Turf Pitch for Collegiate Girls’ High School. Constructed 2011, Engineers.


Donkin Reserve

Donkin Reserve

Urban Renewal Projects for the City of PE done through the MBDA.


East London Cluster Works

East London Cluster Works

45km + of 5.5m wide roadways surfaced throughout the Buffalo City Municipality 2016 - 2018.


Endulini Fruits De-Greening Facility

Endulini Fruits De-Greening Facility

12m high off-shutter concrete walls and concrete hardstands for Endulini Fruits De-greening rooms. Constructed 2018, Engineers Viaplan Structural engineers.


Endulini Pack house

Endulini Pack house

11 000m² extensions on 5-10m high suspended deck and retaining walls to Endulini Fruits pack house. Built 2017, Engineers Viaplan Consulting.


Hitgeheim Citrus Patensie

Hitgeheim Citrus Patensie

Bulk Water Storage, dam walls and Sluice Gates for Endulini Fruits.


Hobie Beach - Shark Rock Pier

Hobie Beach - Shark Rock Pier

Beachfront Upgrade built way back in 1994 still looking just as good as the day it was done.


HOP / T1 on EL IDZ

HOP / T1 on EL IDZ

Dams and Reservoirs


Koöperasie Kirkwood

Koöperasie Kirkwood

Koöperasie Kirkwood


Kwandwe Game Reserve

Kwandwe Game Reserve

2.4km long 70m wide Asphalt runway for owners. Runway rated for G5 Intercontinental Jets, Constructed 2015, Engineers Elwandle Consulting.


Lekkerbly Packhouse

Lekkerbly Packhouse

The Lekkerbly Packhouse, situated in Kirkwood is a 26 000m² citrus packhouse which contains a packing room, coldroom, box making area, staff facilities, degreening room as well as double storey offices.


Maersk Shipping Container Storage

Maersk Shipping Container Storage

New 20 000m² storage facility for Maersk Shipping in the Coega IDZ.


Markman Hardstand

Markman Hardstand

This Hardstand project in Markman is +-5 600m² in size and slopes to a new 160 meter long concrete storm water channel. The works include reforming and reshaping the yard (approximately 18 000m² in size) and is being ripped and compacted solid for truck a


Mimosa Packhouse

Mimosa Packhouse

The Mimosa Packhouse is situated in Kirkwood and is a 30 000 m² citrus packhouse which includes degreening rooms, packing facilities, staff facilities and double storey offices.


Mpact

Mpact

22 000m² New factory, ASIB fire System, Yard alterations, machine bases and office upgrades to Mpact Corrugated Products, Plant kept fully operational during construction, Built 2018.


MSC Chrome Yard

MSC Chrome Yard

30 000m² Chrome handling facility, offices, weighbridges in City Deep Johannesburg.


MSC Shipping Container Storage

MSC Shipping Container Storage

New 36 000m² facility for refrigerated container storage and handling in the Coega IDZ


Mthatha Bridges

Mthatha Bridges

Diversion of 2km of River with mass gabion retaining Structure and the construction of 5 X bridges over the river. Constructed 2015, Engineers WSP Consultants.


Mthatha Mall

Mthatha Mall

575 000m³ of Bulk Earthworks including the blasting of 270 000m³ of hard rock in an urban area, services, bases and 80 000m² of parking area. Built 2014, Engineers WSP, Project Managers SIP.


Nelson Mandela Bay Stadium

Nelson Mandela Bay Stadium

Randcivils performed all the bulk earthworks, services, pitch construction, paved walkways and parking areas on the Prestigious World Cup Stadium which has become a Port Elizabeth Landmark. Constructed 2009, Main contractor Grinaker LTA.


NMU Pump Station

NMU Pump Station

Dams and Reservoirs


Osho Attenuation Ponds

Osho Attenuation Ponds

Biddumn Lined attenuation pond for Osho Cement Grinding Plant.


Osho Cement Grinding Plant Coega

Osho Cement Grinding Plant Coega

20m high structures with 1mm tolerance, concrete retaining structures for material handling, concrete tunnels for conveyors Constructed 2018, Engineers Sinoma Consulting.


PE Cold Storage

PE Cold Storage

25 000m² Cold Storage, 15 000m² Loading Area / container handling yard and 2 000m² Workshop facility for PECS. Built 2009 and 2018, Project manager, Cullingworth and Associates.


Plettenberg Bay Entrance Roads

Plettenberg Bay Entrance Roads

Plettenberg Bay Entrance road Upgrade, Constructed 2018.


Reeston Raw Water

Reeston Raw Water

Dams and Reservoirs


Reeston Water Treatment Plant

Reeston Water Treatment Plant

Bentonite Lined Attenuation ponds for the Reeston Water treatment works.


Reeston Water Treatment Works

Reeston Water Treatment Works

Client - Buffalo City Municipality, 10 ML Reservoir, 2 X 26m diameter clarifiers, 2 Bentonite lined attenuation structures, 15km of pipework's ranging from 1 500mm GRP to 350 PVC, Pump stations, M&E Buildings and office block.


SA5 Fire Terminal for Transnet

SA5 Fire Terminal for Transnet

Dams and Reservoirs


Shell Ultra City N2

Shell Ultra City N2

200 000m³ of Bulk Earthworks, 4 X National Roads SANRAL On - Off Ramps, Building platforms and roadways.


Sommerset East

Sommerset East

1.8km long 50m Wide Asphalt air strip for Department of Public Works, Built 2016, Engineers Delta Consulting.


St Georges Primary

St Georges Primary

Multi purpose sports surface for St Georges Primary School, Built 2017, Engineers Elwandle Consulting.


Sunriver Pack house

Sunriver Pack house

11 500m² Citrus Packing Facility, loading docks and 22 000m² logistics hardstands for Sunriver Citrus, Built 2018, Engineer Viaplan Consulting.


Thorndale Pack house

Thorndale Pack house

8 000m² Citrus Packing facility, cold rooms and 20 000m² logistics hardstand for Du Preez Boerderey, Built 2017, Engineers Viaplan Consulting.


Toyota Forklift

Toyota Forklift

New 5,000m² Warehouse with an additional 1,200m² Office component in Kempston Road, for Toyota Forklift.


Umzonyana Water Treatment Works

Umzonyana Water Treatment Works

Client - Buffalo City Municipality, Full Water treatment Facility with 1 500mm - 350mm Steel - pipes, M&E Building and office Blocks. Engineers Royal Haskoningdhv.


Woodridge Packhouse Addo

Woodridge Packhouse Addo

40 000m² state of the art citrus, sorting, degreening, packing and distribution facility including a multi-storey office block and staff facility.